Project topic
Draw up a concept for the future power supply of a Czech city with two combined heat and power plants
Contracting Party
Power supplier in the Czech Republic
Aims and scope
The project sought to evaluate the technical and economic aspects of converting one power plant from bituminous tar to lignite and of amalgamating both power plant sites.
Project topics
Draw up several heat supply options and assess their qualitative and economic potential using a DCF model for site I
Explore the possibility of amalgamating the district heating networks of both sites
Due diligence analysis for site II including a representation of its supply capacities, verification of contractual and legal requirements, conceptual development (technical requirements, conversion plan, economic assessment)
Project specification
Key services
Technical concepts / case studies
Due Diligence
Topics
Generating technologies
Duration
Approx. 5 months